Menu
Menu
Your Cart
Ceresit Ewi Systems
4eco
Quality Metal Roofing
Torch-on Roofing Felt

Full System Lock Seqo Premium AL-40H25

Full System Lock Seqo Premium AL-40H25
Full System Lock Seqo Premium AL-40H25
  • Product Code: U3110
  • Delivery Time: 10 - 15 working days
  • Brand: Seqo
  • Model: AL-40H25
  • Weight: 4.40kg
Loading...

Available Options

Full System Lock Seqo Premium AL-40H25

Length: 2900mm
Width: 40mm
Thickness: 25mm
Weight: 4.4kg
Brand: Seqo Model: L-150h50
Delivery Time: 10 - 15 working days
Coupler Model: L-150h50 for Model Alupe-150h50..
Brand: Seqo Model: S35
Delivery Time: 10 - 15 working days
Bracket Extension S35 (35 mm) A practical sleeve extension designed to increase the height of mounting brackets. Properties Height: 35 mm Modular design: extensions can be stacked to reach the desired height Durable construction for stable support Easy to install and adjust..
Compare this Product
Brand: Seqo Model: SPV 5-8
Delivery Time: 10 - 15 working days
The advantages of building terraces on a system of adjustable supports: easy to assemble soundproofing the terrace and adhesion without damaging the substrate thanks to the use of rubber pads high load capacity of the system easy leveling quick drainage of water free choice of materials - on t..
Brand: Seqo Model: ALUPCV-80H20
Delivery Time: 10 - 15 working days More options available
Hybrid Board PCV MODEL ALUPCV-80H20 - SEQO Hybrid boards offer at least four times the strength of traditional composite materials while retaining all the advantages of composites, including easy maintenance and surfaces free from splinters and cracks. They are an excellent alternative to wooden boa..
Compare this Product
Brand: Seqo Model: L-start
Delivery Time: 10 - 15 working days
Dimensions:  4000 × 30 × 8 mm..
Compare this Product
Brand: Seqo Model: SPV+
Delivery Time: 10 - 15 working days
The SPV + overlay is used to build terraces on aluminium, composite and wooden profiles. An overlay is required for each bracket model. The brackets are not fitted with caps at the factory Ensures that the joist is kept on the support...

Scheduled Maintenance

Our website is currently unavailable as we prepare for the upcoming year.

We will be back online on January 5th.