Bracket Overlay SPV
Bracket Overlay SPV
- Product Code: U3147
- Delivery Time: 10 - 15 working days
- Brand: Seqo
- Model: SPV+
Bracket Overlay SPV+
The SPV + overlay is used to build terraces on aluminium, composite and wooden profiles.
An overlay is required for each bracket model. The brackets are not fitted with caps at the factory
Ensures that the joist is kept on the support.
Brand: Seqo
Model: BB-110H21
Delivery Time: 10 - 15 working days More options available
Composite railing, chamber with wood grain, model BB-110H21..
Brand: Seqo
Model: PEL-7
Delivery Time: 10 - 15 working days
Aluminium Finishing Strip PEL-7 provides a clean, professional edge to panel and cladding installations.
PropertiesHigh-quality aluminium construction
Used to finish and protect exposed edges
Lightweight and corrosion-resistant
Dimensions: 2900 × 13 × 21 mm
Weight: 0.6kg..
Brand: Seqo
Model: SPV 11-14
Delivery Time: 10 - 15 working days
The advantages of building terraces on a system of adjustable supports:
easy to assemble
soundproofing the terrace and adhesion without damaging the substrate thanks to the use of rubber pads
high load capacity of the system
easy leveling
quick drainage of water
free choice of materials - on t..
Brand: Seqo
Model: Sp07
Delivery Time: 10 - 15 working days
Mounting Profile and Screw (3 Pcs) Sp07 is a practical set designed to securely fix compatible cladding or panel systems in place.
PropertiesProvides a secure and stable installation
Ideal for use with façade or cladding systems
Dimensions: 1800 × 27.9 × 19.5 mm
Easy to install with ..
Brand: Seqo
Model: Foundation Support
Delivery Time: 10 - 15 working days
Foundation system - does not require concrete, which reduces the costs and time of installing the terrace, is environmentally friendly.The foundation system includes:
Foundation bolt
Foundation bracket..
